Under Construction
Completed Building
Â
 |
Sequencing of the THERMAXâ„¢ Wall System components allows multiple trades to work simultaneously, helping speed up the construction process. Â |
![]() |
Lightweight THERMAXâ„¢ (ci) Exterior Insulation is easier to install than exterior gypsum - especially at elevated heights! |
 ![]() |
"Look at this – there's no frost on these screws. Typically at this stage only the gypsum would be installed and in this cold (outside temperature: 20°F), you'd really get to see thermal bridging at work: little ice cubes along the stud screws. But THERMAX™ (ci) Exterior Insulation covers the studs and blocks those thermal bridges."
|
 ![]() |
"The exterior insulation and flashing system was in place before I started spraying, so that made my job of preparing and protecting the work area even easier. And cleanup was faster with STYROFOAMâ„¢ Brand SPF (CM Series) because any foam that got on the floor was easily removed without leaving a residue or mark."
|
![]() |
Second floor interior showing bracing detail – closed in and ready for air barrier application |
Â
 |
One of the newest addresses in the Birmingham, Mich., Triangle District is ready for business! |
![]() |
735 Forest – completed building exterior (View 1) |
![]() |
Inside 735 Forest, the warm and inviting décor in one of the loft-style residences coordinates nicely with the building's energy-efficient and sustainable design. |
![]() |
Flooring, furnishings, fixtures and appliances were chosen to meet the sustainable design vision for 735 Forest. |
Â
Ready to make your mark? We'll do our level best to answer your questions.



 



 