Long-Term Performance for Longterm Care HQ
View more photosThe new Total Longterm Care headquarters is projected to be a model of sustainability in part due to its energy-efficient insulation system. The building's designers anticipate gold or platinum level LEED certification and cost savings that can be shifted to greater capacity to help aging individuals and their families.
This project is being finalized ... check back for updates!
| Project Snapshot | |
| Total Longterm Care Corporate Office – Denver, Colorado | 45,673 ft2 new construction |
| Projected Completion | September 2010 |
| Owners | Total Longterm Care LTCO Seniors Inc. |
| Architect | OZ Architecture |
| Dow Products Used | |
| Wall Assembly | Steel studs with brick, stucco and metal panel veneer over THERMAX™ (ci) Exterior Insulation (2" thick) WEATHERMATE™ Straight Flashing STYROFOAM™ Brand SPF (CM Series) GREAT STUFF PRO™ Gaps & Cracks |
| Foundation | Slab on grade with 2" STYROFOAM™ Brand CAVITYMATE™ Extruded Polystyrene Foam Insulation at the grade beams |