|
Installation
Installation sequence
-
Install the tanking membrane according to manufacturer's instructions.
-
Lay the drainage system.
-
Install PERIMATE DI-A insulation against the tanking membrane, with the grooved face outward, using a suitable adhesive such as INSTA-STIK™.
-
Backfill to the designated level.
Key points
|
|