United Kingdom and Ireland - Installation Sequence


  1. Install the tanking membrane according to manufacturer's instructions.
  2. Lay the drainage system.
  3. Install PERIMATE™ DI-A insulation against the tanking membrane, with the grooved face outward and running vertically, using a suitable adhesive such as INSTA-STIK™  from Dow Building Solutions.
  4. Backfill to the designated level.

Key points

  • ensure boards butt together tightly
  • when installing more than one row of boards ensure the filter fabric on upper rows laps over that of lower rows.