-
Install the tanking membrane according to manufacturer's instructions.
-
Lay the drainage system.
-
Install PERIMATE™ DI-A insulation against the tanking membrane, with the grooved face outward and running vertically, using a suitable adhesive such as INSTA-STIK™ from Dow Building Solutions.
-
Backfill to the designated level.
Key points
-
ensure boards butt together tightly
-
when installing more than one row of boards ensure the filter fabric on upper rows laps over that of lower rows.
