About Us Applications & Products Technical Solutions Resources Job Reference Case Study Contact Us  
 

System Provider

developersystem providerownerarchitectMOC   More Job reference
 
Customer's Needs
  • Quality product and solutions delivering energy saving
  • Meeting high-standard in quality control
  • Reliable well-tested system with proven application in China and globally
  • Full compliance with national codes and local regulations
  • Bring technology expertise
  • Promotion of energy management
 
DBS' Solution – Styrofoam™ Strength
  • Good construction insulation performance
  • Reduce crack and damage in exterior wall caused by huge temperature change, extend the usage life of the building
  • Eliminate cold bridge, reduce condensation in the wall, decrease humidity to avoid mould
 
Insulation Case Study: Zhongxin the 5th Block, Shanghai
 
 
Project Background
Project Name: Zhongxin the 5th Block, Shanghai
Developer: Zhongxin Group
System Probider: Shanghai Full Color Construction Material Co., Ltd.
DBS Product: Styrofoam LB  25mm, around 40,000 sqm
 
System Providers' Concern
In the field of energy-efficient construction, professional handling of materials and professional application is essential. Badly applied insulation on outer walls, for example, can lead to cold bridges. As these areas will be colder than the rest there is a big risk of condensation and mould, leading to health problems and premature decay of building components. The replacement of damaged components and structures of buildings of course results in very high coasts.
   
Styrofoam™ Strength  
  • Good construction insulation performance
  • Reduce crack and damage in exterior wall caused by huge temperature change, extend the usage life of the building
  • Eliminate cold bridge, reduce condensation in the wall, decrease humidity to avoid mould
 
   
"We are proud to cooperate with one of the global Fortune 00 companies – Dow Chemical on XPS to construct energy efficiency building. Due to use Styrofoam™, our XPS test report on Heat – Cold cycle meet national standard. Dow Building Solutions assures the product quality and advanced technology." said G.M. Wang of Full Color.  
   
Project Profile  
  • The project consists of 10 buildings, 18 floors, brick surface

 
Back to Case Studies