About Us Applications & Products Technical Solutions Resources Job Reference Case Study Contact Us  
 

MOC

developersystem providerownerarchitectMOC   More Job reference
 
MOC: Ministry of Construction, here we refer to Shenyang Wall Insulation Office
 
Customer's Needs
  • Set up standard codes of XPS to regulate the market
  • Safety of the system, especially for the tall buildings
  • Project reference
  • System technology training to developers and design institutes to enhance energy efficiency
 
DBS' Solution – Styrofoam™ Strength
  • Styrofoam™ was invented by Dow 60 years ago
  • Superior product quality and service
  • Advanced technology, innovative solutions
  • Testimonial projects in China and global
  • Full compliance with worldwide codes and local regulations
  • Strength in R&D, training and problem solving, backed by technology expertise
 
Insulation Case Study: New Riverside Garden Phase I, Shenyang
 
 
Project Background
Project Name: New Riverside Garden Phase I, Shenyang
Developer: Shenyang Huaxin International and HK Lianmei Properties Co., Ltd.
System Provider: DMT Building Material Co., Ltd.
DBS Product: Styrofoam LB 50mm and 60mm, around 80,000 sqm
 
MOC's Concern
Effective implementation of the policies in daily production and construction is crucial in China. A number of policies and standards concerning energy are in place, but their application id lagging, efforts should be put on to achieve the energy efficiency target by 2010.
   
Styrofoam™ Strength  
"The index of energy efficiency standard used in Shenyang area was set up based on comparisons of walls, built of bricks in 1981 and 1982. The heat consumption at that time was 31 kilograms of coal per square meter. The energy-saving target of 65% currently implemented is thus constituted in line with the heat consumption rate. Effective implementation of the policies in daily production and construction is crucial. A number of policies and standards concerning energy efficiency are in place, but their application is lagging, we shall put efforts on this and also we'd like to cooperate with the world Fortune 500 companies like Dow to promote the energy efficiency solutions in the industry." said Mr. Wang, officer of Shenyang MOC.  
   
Project Profile  

The project consists of 4 phases, all adopted Styrofoam™ Exterior Wall Insulation. Phase I had 31 buildings, 5-9 floors, brick surface, Finished in July, 2004. It won “Silver” award of model project in Northeast 3 provinces and 4 cities.

 
Back to Case Studies